Monday, May 27, 2013

Day 11- Thursday, May 23

Today I was going to calibrate the amplifiers in the valve box but there was a problem in the program that control the input to output voltage going through the amplifier. Mr. Melzak is going to work on it to see if he can fix the problem. Because of that I was not able to do anything with the valve box today. Hopefully tomorrow the problem will be fixed and I will be able to continue my work. I also got to sit in on a concept review meeting for the new TMS lab.  I don't remember what TMS stands for, but it had something to do with temperature. Basically the meeting was just about what  equipment they need, the cost of it, and what the configurations of the equipment would be in the lab. This also included how much it would cost to get the equipment setup in the lab. To buy the equipment and set it up will cost several hundred thousand dollars.